FASTKITCHENS

Kitchen supply & install — Toronto & the GTA

A brand-new kitchen, installed in as little as 10 days.

FastKitchens handles everything — tear-out, cabinets, custom stone countertops, plumbing, electrical, and appliances. One crew. One fixed quote. One ten-day schedule.

  • ✓ Free design consultation
  • ✓ No-obligation quotes
  • ✓ Homeowners, contractors & designers

Your 10-day plan

10
1
2
3
4
5
6
7
8
9
10
  • Tear-out & disposal
  • Site prep & rough-ins
  • Cabinet install
  • Stone countertops
  • Hookups & appliances

Every quote comes with a written day-by-day schedule for your exact project — before we start.

Why FastKitchens

Fast doesn’t mean rushed. It means organized.

One accountable team

Cabinets, counters, plumbing, and electrical under one roof — no waiting on five contractors to coordinate calendars.

A fixed, itemized quote

You approve a written scope and price before day one. No allowances that balloon, no surprise extras.

A day-by-day schedule

You know what happens on day 3 and day 8 before we start. Your kitchen isn’t a mystery timeline.

Materials for every budget

Solid wood, painted MDF, wrapped MDF, and modern laminate — with custom stone counters on every line.

The process

Ten days. Five steps. Zero guesswork.

This is the exact sequence we run on every project — the same crews, the same order, the same accountability from tear-out to walkthrough.

See the full process
  1. 1

    Days 1–2

    Tear-out & disposal

    Floors and walkways protected, the old kitchen removed, and every scrap of debris hauled away. You never touch a bin.

  2. 2

    Days 2–3

    Site prep & rough-ins

    Plumbing and electrical are moved, added, or updated to suit the new layout — done properly, ready for inspection.

  3. 3

    Days 3–7

    Cabinet supply & install

    Cabinets built for your layout arrive and go in: boxes, doors, panels, crown, and hardware — levelled, aligned, and finished.

  4. 4

    Days 7–9

    Custom stone countertops

    Counters are templated on your installed cabinets, precision-fabricated on our accelerated schedule, and installed.

  5. 5

    Days 9–10

    Hookups, appliances & handover

    Final plumbing and electrical connections, appliances installed, a full cleanup, and a walkthrough of your finished kitchen.

Who we work with

Built for homeowners. Trusted by the trade.

Homeowners

One team. One quote. Ten days.

No juggling five trades, no month-long dust bowl. We handle tear-out to appliance hookup — and your free design consultation is on us.

Get your free quote

General Contractors

The kitchen sub that hits dates.

Supply + install scheduled around your build, clean sites your clients can walk, and trade pricing that protects your margin.

See the trade program

Designers

Your design, executed to spec.

A full materials library, precise site measurements, and an install crew that sweats the details you drew. You keep the client relationship.

Partner with us

Questions

Everything people ask before they call.

Still wondering about something? (647) 956-3777 — a real person, not a phone tree.

How can you finish a kitchen in 10 days?

Because everything is under one roof. Cabinets, stone countertops, and licensed trades are scheduled as one project instead of five separate contractors waiting on each other. Your quote comes with a day-by-day schedule; “as little as 10 days” depends on the scope of your project, and we tell you your exact timeline before we start.

What exactly is included?

Removal and disposal of your existing kitchen, site prep and plumbing/electrical rough-ins, supply and installation of new cabinets, supply and installation of custom stone countertops, final plumbing and electrical hookups, and appliance installation. One crew, one accountable company, start to finish.

Is the quote really free?

Yes. We start with a free design consultation and site measure, then give you a written, itemized quote. No deposit, no obligation, no pressure.

What cabinet options do you offer?

Four lines to fit every project and budget: solid wood, painted MDF, wrapped MDF, and modern European-style laminate — plus custom stone countertops in quartz, granite, and porcelain.

Do I need my own contractor or designer?

No — we handle design, supply, and installation end-to-end. Already working with a contractor or designer? Even better: we partner with GCs and designers across the GTA every week and slot into their schedule.

How much does a new kitchen cost?

It depends on the size of your kitchen and the materials you choose, which is why we quote each project individually — free. What we promise: the quote is itemized and fixed before work starts. No surprise extras.

What areas do you serve?

Toronto and the Greater Toronto Area. Not sure if you're in range? Call (647) 956-3777 and ask — it takes two minutes.

Ready for a kitchen that doesn’t take all summer?

Free quote. Free design consultation. A written day-by-day schedule before we start.

Or email info@fastkitchens.ca

Call nowFree quote